How much bandwidth does Guangzhou 10000 people need for online video on demand?

Release time: 2022-02-14 13:43:11

How much bandwidth does Guangzhou 10000 people need for online video on demand? Now on the network, the live video industry is very popular, such as fast trills, fighting fish, etc. How to choose bandwidth when enterprises do video or live broadcast with such a large amount of traffic? The video and live broadcast industry has a high demand for bandwidth, which needs to be determined according to the traffic and the number of online users.

How much bandwidth does Guangzhou 10000 people need for online video on demand? The 10000 person network needs to rent at least 100 megabytes of bandwidth, and the lines can be double line, multi line, BGP lines. After a detailed analysis of the precautions for Hong Kong rental counters and custodial counters, Hong Kong rental counters are not new. Various custodial services are booming all over the country. What is suitable for them? The company's network editor takes Hong Kong cabinet leasing as an example to analyze several aspects that must be paid attention to in Hong Kong cabinet leasing trust:

1. The site guarantees that the Hong Kong cabinet rental and hosting machine room must show customers enough indoor space to place the network server and its computer equipment. The service items in the [Henan Server Rental Fee Table] shall be displayed by the voice card rack of the telecom network level standard network server. The wood floor load of the computer room should meet the requirements of the load design scheme of the telecommunications network computer room. The overall seismic rating is more than about 8, and some special machines and equipment can be shown to customers. In the computer room, customers should be prevented from entering the hosting area as much as possible, and full-time personnel should be responsible for environmental sanitation every day to prevent dust from harming the network server

2. To rent a good Hong Kong cabinet hosting machine room for Internet security, it is necessary to ensure that the customer's network server can access the Internet technology quickly and smoothly, and can select excellent high-end wireless routes by referring to our Hong Kong Xintiandi machine room. The high-speed and reliability of the Internet can be reasonably guaranteed by connecting the backbone nodes of China's Internet technology through the high-speed optical fiber line security channel.

3. The power engineering ensures that a special distribution station can be set up in the machine room rented and managed by the cabinet in Hong Kong. The switching power supply is transmitted from the power station here in two steps. Different transformers [how to speed up foreign websites] are connected to each other, so that all transformers can bear all IDC loads. This can ensure that the power supply system can supply power continuously.

4. Guarantee of natural environment All doors and windows of the port cabinet machine room rented and managed shall be sealed to avoid the impact of dust, noise and other external factors. The size of the entrance and corridor can meet the transportation requirements during the installation of the system software. Wood floor shall be anti-static and have high compressive strength. The raw materials for the ceiling decoration of the machine room meet the fire safety requirements, and sound absorbing materials with good sound insulation and noise reduction, convenient installation and maintenance, and no dust are used. The light intensity of the main engine room is also specified. In order to ensure the temperature and ambient humidity of the machine room, special air conditioning and ventilation equipment can be installed for temperature control.

5. The security assurance server port network contains a large number of customer statistics, so the computer room must display security assurance. The machine room can be equipped with a TV monitor and an automatic control system for entering and exiting the machine room to ensure that no monitoring blind area can be found in all buildings. TV monitor, etc. There must also be full-time personnel on duty 24 hours a day.